Operations
Why filling accuracy costs less than you think
Over-filling by half a percent sounds trivial until you multiply it across a year of production. Here's the arithmetic.On a line running 30,...
Read moreNow shipping servo-driven monoblock lines — commissioned in 3 days.
See the range
A machine that costs 30% less but stops twice a week is not cheaper. We break down downtime, giveaway and rework into a single number you can compare against the quotation.
Most buying decisions weigh purchase price far more heavily than the operating cost that follows it. Once you account for lost production during breakdowns, over-fill giveaway from an inaccurate dosing head, and the labour spent on rework, a "cheaper" machine can cost several times its price difference within the first year alone.
Before you sign off on a quotation, ask for the accuracy tolerance, the mean time between failures, and the spare-parts lead time — not just the price.
Operations
Over-filling by half a percent sounds trivial until you multiply it across a year of production. Here's the arithmetic.On a line running 30,...
Read more
Operations
Tooling design, recipe memory and a disciplined checklist can cut changeover from hours to minutes.Most changeover time is lost to searching...
Read more
Engineering
Most capacity problems are specification problems. A short guide to sizing equipment against real demand.It is tempting to specify against t...
Read more